The Municipal Wastewater Dilemma
Aging infrastructure and urban land scarcity force cities to choose between:
❌ Costly plant expansions ($200-500/m³)
❌ Compromised effluent quality during peak flows
JUNTAI's hybrid system offers a third way.
3 Innovations for Existing Plant Retrofits
1️⃣ Drop-in MBBR Modules
Directly add 45% fill ratio carriers to aeration tanks
Increase biomass by 3x without new reactors
2️⃣ Stackable Tube Settlers
Install over existing clarifiers (adds <1m height)
Achieve 40% higher hydraulic loading rate
3️⃣ Smart Process Control
IoT sensors adjust aeration based on diurnal flow changes
Energy savings up to 25%
Case Study: Jakarta's 100,000m³/day WWTP Upgrade
| Metric | Before | After JUNTAI Retrofit |
|---|---|---|
| Peak Flow Capacity | 120,000m³/day | 220,000m³/day |
| Energy Consumption | 0.38 kWh/m³ | 0.28 kWh/m³ |
| Construction Time | N/A (retrofit) | 90 days |
Client Voice:
"We doubled capacity within our original footprint – a game-changer for dense cities."
– Ms. Dewi, Municipal Engineer