Space-Saving Hybrid Systems: How JUNTAI Doubles Municipal WWTP Capacity Without New Construction

May 07, 2025

Leave a message

The Municipal Wastewater Dilemma


Aging infrastructure and urban land scarcity force cities to choose between:


❌ Costly plant expansions ($200-500/m³)
❌ Compromised effluent quality during peak flows

 

JUNTAI's hybrid system offers a third way.

 


 

3 Innovations for Existing Plant Retrofits


1️⃣ Drop-in MBBR Modules

Directly add 45% fill ratio carriers to aeration tanks

Increase biomass by 3x without new reactors

 

2️⃣ Stackable Tube Settlers

Install over existing clarifiers (adds <1m height)

Achieve 40% higher hydraulic loading rate

 

3️⃣ Smart Process Control

IoT sensors adjust aeration based on diurnal flow changes

Energy savings up to 25%

 


 

Case Study: Jakarta's 100,000m³/day WWTP Upgrade

 

Metric Before After JUNTAI Retrofit
Peak Flow Capacity 120,000m³/day 220,000m³/day
Energy Consumption 0.38 kWh/m³ 0.28 kWh/m³
Construction Time N/A (retrofit) 90 days

 

Client Voice:
"We doubled capacity within our original footprint – a game-changer for dense cities."
– Ms. Dewi, Municipal Engineer