-
RAS Technical Analysis: MBBR Biofilm Reactors, Microscreen Drum Filters & Mic...Aug 26, 2026A recirculating aquaculture system (RAS) combining MBBR biofilm reactors, an 80-100 mesh microscreen drum filter and microporous aeration achieved 1,0read more -
Carbon-to-Nitrogen Ratio in Activated Sludge: How a 6:1–8:1 C/N Balance Deliv...Aug 13, 2026A pilot-scale study on carbon-to-nitrogen ratio in secondary biological wastewater treatment shows low C/N (below 4:1) limits denitrification to 60–75read more -
Juntai Disc Diffuser Anti-Fouling, Cleaning & Troubleshooting Guide: Keep EPD...Aug 10, 2026Practical maintenance guide for Juntai EPDM disc diffusers (DD215, DD270, DD350): five rules that prevent membrane fouling, a monitoring schedule thatread more -
Tube Settler for Coal Washing Wastewater Treatment: 90% SS Removal, 70% Faste...Aug 10, 2026A coal washing wastewater plant in Central Asia used PP hexagonal tube settlers to cut effluent SS from 150-250 mg/L to below 40 mg/L (over 90% removaread more -
PFAS Removal from Wastewater Effluents: Activated Carbon and Ion Exchange for...Aug 05, 2026Conventional secondary wastewater treatment removes only a small fraction of per- and polyfluoroalkyl substances (PFAS), leaving forever chemicals inread more -
Industrial Wastewater Treatment Case Study with MBBR TechnologyAug 05, 2026A complete case study of a 1,200 m³/d food processing wastewater treatment plant using MBBR technology, achieving stable performance, high COD removalread more -
Tube Settler Water Distribution and Sludge Discharge Design: A Practical Engi...Jul 31, 2026A comprehensive design guide for tube settler sedimentation tanks covering inlet water distribution systems, sludge discharge mechanisms, and a workedread more -
MBBR Media Applications in Indonesia: Two Case Studies in Municipal and Indus...Jul 31, 2026How MBBR media retrofits solved wastewater treatment challenges at a Jakarta municipal WWTP (15,000 m³/d) and a Surabaya palm oil mill (1,200 m³/d). Cread more -
MBR Performance Under Organic Shock Loading: How Membrane Bioreactors Handle ...Jul 31, 2026A controlled study evaluating MBR system stability under variable organic shock loading conditions. COD removal recovered within 24–48 hours, but membread more -
Municipal Wastewater Plant Upgrade with Tube Settlers: 44% Capacity Increase ...Jul 24, 2026A municipal WWTP retrofit using 60 mm hexagonal PVC tube settlers to expand secondary clarification from 45,000 to 65,000 m³/d without new constructioread more -
Performance of Anammox-Based Nitrogen Removal in Secondary Wastewater Treatme...Jul 24, 2026A 90-day pilot study evaluating mainstream-temperature anammox for secondary wastewater treatment. At 20–25°C and 40–80 mg N/L influent, the system acread more -
MBBR Control System Design and Application: PLC, VFD, and IoT Integration for...Jul 24, 2026A practical engineering guide to electrical control system design for MBBR integrated treatment units handling 50–500 m³/d. Covers PLC selection withread more

