Installation Of Tube Settler

Mar 08, 2023

Leave a message

Installation of Tube Settler

 

Here's a piece on how to install Tube Settler for sewage treatment equipment.

 

Tube Settler in sewage treatment equipment is special connectors used to connect pipelines, typically for inflow and outflow points of treatment plants. Their unique structure connects two pipes at an angle of 45 or 90 degrees, with the axis of the two pipes not in the same plane. As a result, installing Tube Settler requires some skill. Below, I will explain how to install Tube Settler in sewage treatment equipment.

 

Step 1: Determine the installation location of the Tube Settler. Typically, the Tube Settler should be installed on a horizontal section of the pipeline to minimize the impact of water flow and resistance and avoid affecting the normal operation of the treatment equipment. At the same time, attention should be paid to the angle and position of the Tube Settler, to ensure that the axis of the Tube Settler and the axis of the pipeline meet the requirements.

 

Step 2: Conduct a pre-installation of the Tube Settler. In actual construction, we usually conduct a pre-installation of the Tube Settler to check if the installation location meets the requirements and to adjust the angle and position of the Tube Settler. During the pre-installation, we need to connect the Tube Settler and the pipeline, and then adjust the angle and position of the Tube Settler with a threaded rod until the requirements are met.

 

Step 3: Perform the welding of the Tube Settler. Before welding, we need to clean and degrease the weld of the Tube Settler and the pipeline to ensure the quality of the weld. During welding, we need to control the welding temperature and speed to avoid burn-through or defects such as blowholes. After welding, we need to inspect the weld to ensure that the quality meets the requirements.

 

Step 4: Perform post-processing on the Tube Settler. After the installation and welding of the Tube Settler are completed, we need to perform post-processing on the Tube Settler, including polishing, cleaning, and painting the weld. These post-processing works can ensure that the Tube Settler has an attractive appearance and good durability.

 

In conclusion, installing Tube Settler in sewage treatment equipment requires attention to many details, including the installation location, adjustment of the angle and position of the Tube Settler, pre-installation and welding of the Tube Settler, and post-processing of the Tube Settler. Only by mastering the correct installation method can we ensure the quality and stability of the Tube Settler, and guarantee the normal operation of the entire sewage treatment equipment.